Purple Rainbow Mirror Chrome S-Curve Glass Water Pipe Disc Percolator 11 inch

Purple Rainbow Mirror Chrome S-Curve Glass Water Pipe Disc Percolator 11 inch

Product form

The Violet Serpent Glass Water Pipe features a bold purple rainbow mirror chrome finish with beautiful shifting tones of violet,... Read more

$52.39 Excl. VAT

    • Fast 1 Business Day Processing
    • Free Shipping on Orders $29+

    SKU: LATC001

    Product & Store Information

    Maru Pipe is an online store offering curated glass pieces and smoking accessories with fast processing, secure checkout, and discreet shipping.

    Orders can be placed directly through our webshop.

    Do you need a large stock? Contact us

    Available on working days between 9:00 am to 6:00 pm.

    Send us a message!

    Description

    The Violet Serpent Glass Water Pipe features a bold purple rainbow mirror chrome finish with beautiful shifting tones of violet, blue, pink, gold, and aqua. Its most eye-catching feature is the unique S-curve neck design, giving the piece a sculptural and artistic look while maintaining a functional water pipe shape.

    This piece measures approximately 11 inches tall and includes a rounded base chamber with a visible internal disc percolator for added filtration. The reflective mirror chrome finish enhances the curved silhouette and gives the glass a premium iridescent appearance that changes under different lighting conditions.

    A removable glass bowl is included, and the angled joint makes the overall profile stand out even more. This water pipe is ideal for customers looking for a stylish display-worthy piece with a distinctive modern design.

    Features

    • Approx. 11 inches tall
    • Purple rainbow mirror chrome finish
    • Iridescent reflective surface
    • Unique S-curve neck design
    • Rounded lower chamber
    • Internal disc percolator
    • Elevated upper chamber
    • Angled joint
    • Removable glass bowl included
    • Thick rounded mouthpiece
    • Artistic and eye-catching profile

    What’s Included

    • 1 Purple Rainbow Mirror Chrome Glass Water Pipe
    • 1 Removable Glass Bowl

    Care Instructions

    Rinse with warm water after use and clean regularly with glass-safe cleaning solution. Handle carefully during washing and drying. Avoid abrasive materials that may affect the mirror chrome finish.

    Note

    Because of the reflective rainbow mirror chrome finish, colors may appear slightly different depending on lighting and viewing angle. Minor variations may occur due to the handcrafted nature of glass products.

    Item Specifics

    • Type: Glass Water Pipe
    • Color: Purple Rainbow Mirror Chrome
    • Material: Glass
    • Height: Approx. 11 inches
    • Style: S-Curve Neck
    • Percolator: Disc Percolator
    • Finish: Mirror Chrome / Iridescent
    • Bowl Included: Yes
    • Condition: New
    • Theme: Artistic / Modern / Reflective

    Specifications

    • Weight: 200gr
    • Usage: Indoor & outdoor

    Find Your Next Favorite Piece

    Explore unique glass and everyday smoking essentials, all in one place.

    Why Shop MaruPipe

    • Unique & Curated Selection

      Distinctive glass pieces and smoking essentials selected for style, variety, and personality.

    • Fast Order Processing

      Orders are processed within 1 business day, Monday through Friday.

    • Carefully Packed

      Every order is packed with care to help your items arrive safely and securely.

    • Customer Care

      Questions about a product or your order? We’re here to help with friendly, responsive support.

    • <h2>Fresh Drops & New Finds<br/></h2>

      Fresh Drops & New Finds

      Discover new glass and smoking essentials added to our collection.

    • <h2>Find Your Perfect Piece</h2>

      Find Your Perfect Piece

      From colorful statement glass to simple everyday essentials, explore pieces for every style.

    • <h2>Fast, Secure & Discreet Shipping</h2>

      Fast, Secure & Discreet Shipping

      Orders are processed within 1 business day and carefully packed for safe delivery.

    What Our Customers Say

    See why customers keep coming back to MaruPipe

    • Fast shipment, friendly service and quality item. Packaged well and arrived safely ahead of schedule and as pictured. I am very pleased with this seller and hope for an opportunity to do business with them again

      5/5 njustice4all87_1, Royal Customer of MaruPipe
    • Extremely happy with the bong I purchased. It was exactly as described and as appeared in the photos, was packed carefully and was shipped out lightning fast. Excellent shop!

      5/5 ottimo-massimo, Royal customer of MaruPipe
    • As described works great and always responded back quickly I recommend you don’t see all the colors in the pictures that lights bring out so they do look alot prettier in person. Packing no was great and shipped quickly just as it says :)

      5/5 lisam8689, Royal customer of MaruPipe

    FAQ's

    Do you have a minimum order amount?

    No. There’s no minimum order at Maru Pipe. Order as little or as much as you like. BIG SAVE: Spend $29 or more and the $3.99 shipping fee is waived for each item — you’ll get FREE SHIPPING!

    How much is shipping?

    Standard shipping is $3.99 for orders under $29. Spend $29 or more and enjoy FREE SHIPPING.

    How quickly will my order be shipped?

    Orders are typically processed within 1 business day, Monday through Friday. Orders placed on weekends or holidays are processed the next business day.

    Is my order shipped discreetly?

    Yes. Orders are carefully packed in discreet packaging with no unnecessary product details displayed on the outside.

    What if an item I want is sold out?

    Popular styles can sell out quickly. Check back for restocks and new arrivals, or browse similar pieces currently available in our collection.

    Collections you may also like

    Recently viewed products

      © 2026 MaruPipe, Powered by Shopify

        • American Express
        • Apple Pay
        • Diners Club
        • Discover
        • Google Pay
        • JCB
        • Mastercard
        • Visa